Public Work

765 Kv SIC Maimpuri Bara Project

Proyecto 765 Kv SIC Maimpuri Bara
Project Status: 
Completion Date: 
2017
Industry: 
Type: 
Description: 
765 kV SIC Mainpuri-Bara EPC transmission system with a total length of 1175 km and 765/400 kV associated substations.

Macapa Project

Proyecto Macapa
Project Status: 
Completion Date: 
2015
Industry: 
Type: 
Description: 
500 kV Oriximina–Jurupari, 230 kV Jurupari-Laranjal and Laranjal-Macapa EPC transmission lines with a total length of 713 km. 3 500 kV and 230 kV associated substations. Special crossing of the Amazon River with a 2200 m span bridge and 2 295 m high towers.

Substation Phase VIII Project

Project Status: 
Completion Date: 
2010
Industry: 
Type: 
Description: 
EPC 13 66/11 kV voltage substations, 3230/66/11 kV voltage substations and 1 132/66/11 kV voltage substation.

WETT Project

Proyecto WETT
Project Status: 
Industry: 
Type: 
Description: 
7 EPC 345 Kv transmission line segments with a total distance of 606 km and 5 345 kV substations.

Interconnection Project North-South III

Proyecto  Interconexion Norte -Sur III
Project Status: 
Completion Date: 
2008
Industry: 
Type: 
Description: 
500 kV EPC Transmission Lines Serra da Mesa II-Luziãnia, Paracatu IV-Emborcaçao and Luziãnia-Samambaia with a total length of 678 km. 5 associated 500 kV substations.

Triangulo Project

Proyecto Triangulo
Project Status: 
Completion Date: 
2009
Industry: 
Type: 
Description: 
EPC 500 kV Transmission Lines Emborcaçao-Nova Ponte, Nova Ponte-Itumbiara, Nova Ponte-São Gotardo 2- Bom Despacho 3 and Nova Ponte-Estreito with a total length of 695 km. 6 associated 500 kV substations.

Pages

Subscribe to RSS - Public Work