Macapa Project

Proyecto Macapa
Project Status: 
Completion Date: 
2015
Industry: 
Type: 
Description: 
500 kV Oriximina–Jurupari, 230 kV Jurupari-Laranjal and Laranjal-Macapa EPC transmission lines with a total length of 713 km. 3 500 kV and 230 kV associated substations. Special crossing of the Amazon River with a 2200 m span bridge and 2 295 m high towers.

Interconnection Project North-South III

Proyecto  Interconexion Norte -Sur III
Project Status: 
Completion Date: 
2008
Industry: 
Type: 
Description: 
500 kV EPC Transmission Lines Serra da Mesa II-Luziãnia, Paracatu IV-Emborcaçao and Luziãnia-Samambaia with a total length of 678 km. 5 associated 500 kV substations.

Triangulo Project

Proyecto Triangulo
Project Status: 
Completion Date: 
2009
Industry: 
Type: 
Description: 
EPC 500 kV Transmission Lines Emborcaçao-Nova Ponte, Nova Ponte-Itumbiara, Nova Ponte-São Gotardo 2- Bom Despacho 3 and Nova Ponte-Estreito with a total length of 695 km. 6 associated 500 kV substations.

Xingu Project

Proyecto Xingu
Project Status: 
Completion Date: 
2013
Industry: 
Type: 
Description: 
500 kV Tucuruí–Xingu–Jurupari EPC transmission lines with a total length of 527 km. 2 associated 500kV substations.