Energy

Nea Noa Project

Proyecto Nea Noa
Project Status: 
Completion Date: 
2011
Industry: 
Type: 
Description: 
500 kV electricity transmission system program with a total length of 572 km from Norte Grande and interconnection with Eastern phase

Comahue-Cuyo Project

Proyecto Comahue-Cuyo
Project Status: 
Completion Date: 
2011
Industry: 
Type: 
Description: 
Comahue-Cuyo 500 kV electricity transmission system program with a total length of 195 km on the Northern phase

IENE Project

Proyecto IENE
Project Status: 
Completion Date: 
2010
Industry: 
Type: 
Description: 
EPC LT 500 kV Colinas-Ribeiro Gonçalves and LT 500 kV Ribeiro Gonçalves-Sao Joao Piauí with a total length of 710 km. Colinas 500 kV, Ribeiro Gonçalves 500 kV and Sao Joao Piauí 500 kV associated substations.

Capanda-Viana Project

Proyecto Capanda-Viana
Project Status: 
Completion Date: 
2009
Industry: 
Type: 
Description: 
EPC 400 kV and 220kV Transmission Lines with a total length of 300 km. Lucala, Capanda and Viana 400/220 kV substations.

REHABILITATION OF PROJECT JEBBA DAM, RIVER NIGER

Project Status: 
Industry: 
Type: 
Description: 

Rehabilitation of Jebba Spillway discharge channel and the grouting of auxiliary dam No. 3 at Jebba Hydro Power Station:

  • Strengthening of the walls of the main and secondary spillway
  • Ancillary works (Hydraulic equipment, leak control, parking, VRD)

Pages

Subscribe to RSS - Energy