Equipment

Hospital and Polyclinic Alberto Leonardo Barton Thompson

Completion Date: 
2014
Industry: 
Type: 
Description: 

The Hospital and Polyclinic Alberto Leopoldo Barton Thompson will offer a wide range of high quality medical services to the local community. The Hospital will be equipped with state of the art technology, backed by the most recognized brands in the world of biomedical equipment. With modern infrastructure, the hospital will be able to treat general consults, special cases, make highly complex surgical interventions and will be able to realize laboratory studies and diagnostics.

Hospital Simbi Continental

Project Status: 
Completion Date: 
2016
Industry: 
Type: 
Description: 
The structure is entirely made ​​of reinforced concrete, with a system of light frames and slabs. Have a level and a construction area of about 3460 m². The hospital has two generators, one for general use 600 kW and a backup for critical areas 45kW located in a platform on the west side of the building. It also has a rainwater tank with a capacity of about 50.000 gallons in the courtyard and an area of ​​recycling and waste management at the east end of the site.

Las Tablas Primary Care Center

Project Status: 
Completion Date: 
2013
Industry: 
Type: 
Description: 
Construction and equipment of a new primary care center in the region of Las Tablas, Panama. The Las Tablas Primary Care Center is a first class establishment, which offers activities for promotion, prevention, outpatient and rehabilitation. It will also provide medical consultation services, emergencies, observation, trauma therapy, clinical laboratory, pharmacy, epidemiology care programs, control of them and for patients with infectious medical conditions.

Volcan Primary Care Center

Project Status: 
Completion Date: 
2013
Industry: 
Type: 
Description: 

Construction and equipment of a new primary care center in the region of Volcan, Panama. The Volcan Primary Care Center is a first class establishment, which offers activities for promotion, prevention, outpatient and rehabilitation. It will also provide medical consultation services, emergencies, observation, trauma therapy, clinical laboratory, pharmacy, epidemiology care programs, control of them and for patients with infectious medical conditions.

Lycée Touissant Louverture

Project Status: 
Completion Date: 
2015
Industry: 
Type: 
Description: 
This project includes the design and construction of a building for the secondary section, including 24 classrooms, library, computer room, administrative offices. The primary section includes 16 classrooms, library, administrative offices, sanitary facilities, etc. Includes also the construction of a building for laboratories, construction of a cafeteria, auditorium and a multi-field games. Identical reconstruction of the building of the Friendly Lycée Toussant Louverture First phase executed: 2015 Second phase: 2016 Under Development

Lycée Alexandre Petion

Project Status: 
Completion Date: 
2016
Industry: 
Type: 
Description: 

This project includes the design and construction of a building for the secondary section, including 21 classrooms, library, computer room, administrative offices. The primary section includes 16 classrooms, library, administrative offices, sanitary facilities, etc. Includes also the construction of a building for laboratories, construction of a cafeteria, auditorium and a multi-field games. Identical reconstruction of the building of the Friendly Lycée Alexandre Petion.

First phase executed: 2015

Hospital and Polyclinic Guillermo Kaelin De La Fuente

Completion Date: 
2014
Industry: 
Type: 
Description: 
The Hospital and Polyclinic Guillermo Kaelin De La Fuente will offer a wide range of high quality medical services to the local community. The Hospital will be equipped with state of the art technology, backed by the most recognized brands in the world of biomedical equipment. With modern infrastructure, the hospital will be able to treat general consults, special cases, make highly complex surgical interventions and will be able to realize laboratory studies and diagnostics.

Dr. Reynaldo Almánzar Maternity Hospital

Project Status: 
Completion Date: 
2012
Industry: 
Type: 
Description: 
The General and Specialty Hospital at the City of Health in the Dominican Republic is a "turnkey" project that includes the construction and equipment of the facility. The Maternity Hospital forms part of a new health complex on the Konrad Adenauer Avenue in North Santo Domingo. The new hospital consists of 320 beds distributed over five floors as well as state of the art medical equipment.

City of Health

Project Status: 
Industry: 
Type: 
Description: 
The City of Health is a multi-building, multi-phased "turnkey" construction and equipment project that includes four hospital and various supporting facilities located in North Santo Domingo in the Dominican Republic. The new facilities include state of the art medical equipment as well as traumatology, pediatric, maternity, and a general / specialty services.

Anita Moreno General Hospital

Project Status: 
Completion Date: 
2018
Industry: 
Type: 
Description: 

The new Anita Moreno Hospital will be located in La Villa, Los Santos District, Panama.  The hospital will count with a specialized psychiatric unit and will provide the latest generation medical equipment for services that include external consult, emergencies, ambulatory care, intensive care units, hospitalization, laboratory, and pathology.  The hospital will have  a capacity of 256 beds, distributed as follows: 120 for Psychiatry and 136 for Internal Medicine.

Pages

Subscribe to RSS - Equipment